Test your project control system

Published by Massimoluigi Casinelli on

Roman arch – Minturno (LT) – Italy

Scope of a Project Control System

In essence, the scope of a project controls system is streamlining and enhancing the management decisions; the main capabilities can be summarized in four points:

  1. Providing a valid support in defining and developing the project baseline;
  2. Providing flexible and realistic means in measuring and assessing actual progress vs. planned baseline, by allowing an articulate analysis of the progress and performance achieved;
  3. Detecting and assessing as earliest as possible any possible event or situation which may impacts the progress of the project;
  4. Producing reports which could be obtained at different levels of details, tailored and customized to specific needs.

Test your project control system: can you answer all these questions?

  1. What is the actual percent completion “to date” of the project? What is the planned percent completion “to date”? Are you able to measure physical vs. economical percent completion as well as the schedule progress? Are you able to monitor critical/subcritical paths and total float consumption?
  2. Do you get regular updates and reliable estimates of the expected completion date and of the intermediate contractual and management milestones?
  3. Does the organization match the needs of the current status of the project? Do you have an updated estimate of the resources (internal and external) effort necessary to respect the next milestones?
  4. Do you have an updated and reliable estimate of the costs to complete and cost at completion of the project?
  5. Are you able to evaluate the performances obtained and the productivity to improve them?
  6. Is there a structured risk plan for the project in relation to events that could hinder its expected performance?
  7. Are you able to analyze and evaluate the project changes effectively in terms of cost and time impact?
  8. Are the management of the project and the company’s top management satisfied with the information they receive regularly about the “progress” of the project(s)?
  9. Are the Client and other key Stakeholders satisfied with the information they receive regularly regarding the “progress” of the project?
  10. Do you have effective tools to consolidate in the company the experience and knowledge (lessons learned) achieved on the project?

Set up and implementation of the project control system

In real application, especially on large size projects, it is necessary a preliminary study of the project and its context, as well as of the contract scheme, in order to design the project controls system in all its components: organization, processes modeling, contractual and procedural framework (i.e. project controls prescriptions and project controls procedures), which must be integrated with the whole set of project management and governance procedures. This is necessary also to implement properly the earned value management (EVM). A key sub-set element of the project control system stands on the progress measurement system which is the topic of my next post in progress.

Digiprove sealCopyright secured by Digiprove © 2020 Massimoluigi Casinelli

Massimoluigi Casinelli

Massimoluigi Casinelli

I am a chartered civil engineer and certified CCP (cost engineering and total cost management) at AACE International, with thirty years of experience in project management of the construction sector. I deliver expert planning, programme management and project controls on multibillions-Euro infrastructure programmes, including highways and railways, metro, air terminals and complex buildings (commercial, residential, schools), with some experience in oil & gas and power. I worked in advanced contexts of project management (from matrix organizations of EPC contractors to large employers organized to manage complex capital projects), by undertaking various roles in the field of project management / controls and contract management; this diverse range of experiences allowed me to gain knowledge on the various components of project controls (schedule, cost estimating, budgeting and cost control, progress and performance measurement, risk and claim management). I am an Italian citizen, currently in Italy.

0 Comments

Leave a Reply

Your email address will not be published. Required fields are marked *

All original content on these pages is fingerprinted and certified by Digiprove
error: Content is protected !!